-CLEAVER-BROOKS CB SERIES PACKAGED BOILER
-MODEL: CB200-80
-SERIAL: L-92820
-YEAR: 1994
-80 HP INDUSTRIAL FIRETUBE BOILER (4 PASS DRY BACK DESIGN)
-MAX PRESSURE: 150 PSI
-INPUT: 3,350,000 BTU/HR
-FUEL: NATURAL GAS (ORIGINALLY DUAL FUEL CAPABLE)
-REFURBISHED UNIT – COMPLETELY RE-TUBED (DOCUMENTED)
-BOILER CLEANED INSIDE AND OUT / REPAINTED
-PRESSURE VESSEL, TUBES, AND PIPING HYDROSTATICALLY TESTED
-NEW FIRESIDE AND WATERSIDE GASKETS INSTALLED
-NEW CONTROL AND ELECTRICAL DISTRIBUTION PANELS
-FIREYE BURNERLOGIX FLAME SAFEGUARD CONTROLS INSTALLED
-HONEYWELL HIGH LIMIT (MANUAL RESET), OPERATING, AND MODULATING PRESSURE CONTROLS
-GAS TRAIN COMPONENTS AND GAS PRESSURE SWITCHES TESTED
-NEW RELIEF VALVE (INSTALLED OR INCLUDED FOR FIELD INSTALLATION)
-460V / 3 PHASE / 60 HZ ELECTRICAL (PER REFURB SPECS)
-INDUSTRIAL STEAM BOILER – READY FOR STARTUP
-GUARANTEED TO PASS HYDROSTATIC TEST AT STARTUP
One (1) 1994 80 HP Cleaver Brooks 4 pass dry back, 150 PSI design pressure, natural gas. This boiler has been completely re-tubed and the work is documented. It has been cleaned on the inside, outside, and painted. The boiler pressure vessel, tubes, piping, trim piping, and blowdown valves have been hydrostatically tested. New fireside and waterside gaskets have been installed. New control and electrical distribution panels have been installed. New Fireye Burner Logix flame safeguard controls have been installed. All gas train components and gas pressure switches have been tested. New Honeywell High Limit with manual reset, Operating Limit, and Modulating Limit steam pressure controls have been installed. A new relief valves will be installed or shipped loose for field installation. The boiler is wired for 460/3/60 VAC. We guarantee that the pressure vessel and tubes are in good condition, and the boiler will pass a hydrostatic test at the time of startup.